This was an unusual project because the floor was installed incorrectly from the beginning. We removed all of the existing maple planks and installed a new sub floor and then cross members. After the sub floor was complete to competition drawings, we installed the old planks with some new maple and sanded smooth. You can see the old read lines all over the place. This was the first floor that was completed in waterborne finish and it still looks amazing.